Loft Clearance
Remove the old material and leave a clean working space.
- Old mineral wool removed
- Bagging and carry-out
- General clean-up
- Best for sale or renovation prep
Choose the level that matches your home: simple clearance, a clean mineral-wool refresh, a space-saving multi-foil roof system, or the complete hybrid package.
Old wool is often uneven, compressed, dusty, contaminated or interrupted around joists, cables and storage boards. Those gaps can undermine the whole result.
Tap each stage. The diagram changes so customers understand the offer without reading a long technical description.
The most affordable option for homeowners who need the old mineral wool removed, bagged and carried out before renovation, sale or future insulation work.
For roof upgrades in existing dwellings in England, Approved Document L uses a whole-element U-value target. The required thickness depends on the product’s thermal conductivity, joists, air gaps and the complete roof build-up.
Illustrative mineral-wool performance using λ ≈ 0.044 W/mK. Real whole-roof U-values vary because timber joists and junctions create thermal bridging.
| 100mm wool | R ≈ 2.27 m²K/W | basic top-up / partial layer |
| 200mm wool | R ≈ 4.55 m²K/W | strong upgrade, build-up dependent |
| 300mm wool | R ≈ 6.82 m²K/W | common modern loft specification |
Remove the old material and leave a clean working space.
Clear poor material and install fresh Knauf or Rockwool at ceiling level.
Insulate at rafter level where preserving usable loft volume matters.
Clearance, fresh mineral wool and multi-foil combined in one coordinated system.
The estimator below is a visual prototype. Your final rates can be inserted after you confirm labour, waste, travel and product costs.
Prototype rates only. Final quotation follows a survey, access check and confirmed material specification.
| Customer priority | Clearance | Mineral wool | TLX roof system | Hybrid |
|---|---|---|---|---|
| Lowest upfront cost | Best | Medium | Higher | Highest |
| Clean, empty loft | Yes | If included | Optional | Yes |
| Ceiling-level thermal upgrade | No | Best | Not its main role | Yes |
| Preserve usable loft volume | Yes | Needs raised boarding | Best | Very good |
| Future loft conversion planning | Preparation | Limited | Strong option | Best starting point |
| Year-round comfort focus | No | Good | Very good | Most complete |
Access, roof type, ventilation and existing insulation reviewed.
We select the right package and define the proposed build-up.
Old material is removed where included and the loft is prepared.
Wool, TLX or both are fitted with continuity and air spaces in mind.
The work is inspected, photographed and left clean.
No. Building Regulations set thermal-performance requirements, normally expressed as a U-value for the complete roof element. Around 270–300mm of conventional loft roll is a common way to approach modern performance, but the correct thickness depends on the exact material and construction.
A rafter-level multi-foil system can preserve more useful floor area than simply laying deep wool under storage boards. It can also become part of a future roof-level insulation strategy. It is not an automatic substitute for every wool build-up: the roof, air spaces, ventilation, moisture risk and target U-value must all be checked.
Insulation alone does not make a loft legally habitable. A conversion normally requires Building Control approval and may involve structural floors, stairs, fire protection, escape provisions, ventilation, windows and electrical work. The insulation system should be designed as part of that wider project.
Sometimes. A top-up may be sensible where the existing layer is dry, clean and correctly installed. If it is contaminated, heavily compressed, patchy or obstructing ventilation, removal and a fresh build-up is usually the better technical solution.
Reflective insulation derives part of its performance from adjacent low-emissivity surfaces and specified air spaces. Compressing the product or omitting the required gaps can reduce its performance, so manufacturer installation details must be followed.
Tell us your postcode, approximate loft area and how you want to use the space. We will recommend the most suitable level without unnecessary upselling.
+44 7852 211204
support@heat-shield.co.uk
Fill in your details to receive your free quote
We've received your request and will be in touch shortly with your free quote.